Case Studies

EMP-shielded modular data center with Faraday cage protection for defense and critical infrastructure

Shielded Modular Data Center (EMP/IEMI Protection)

Fully shielded modular enclosure with verified Faraday-grade protection, EMP-rated SPDs, and concurrent-maintainable power/cooling for sensitive workloads.

Read the case study

Interior corridor of energy-efficient modular data center with server racks behind glass doors, raised floor tiles, and power distribution panels

Public-Sector Modular Data Center (Energy-Efficient, Relocatable Build)

Two joined 40-ft containerized data centers hosting up to 120 kW IT load, combining hybrid free-cooling with DX systems for Tier III resilience and low OPEX.

Read the case study

Containerized modular data center with Vertiv Liebert cooling units and Cummins diesel generator deployed on concrete pad for traffic monitoring infrastructure

Modular Data Centers for National Road-Traffic Video Capture Infrastructure

Two-site, four-module complex providing 320 kW total IT load, N+1 power and cooling, and full data replication for nationwide traffic-violation analytics.

Read the case study

Interior of mobile modular data center with Vertiv server racks, overhead cable management trays, fire suppression system, and structured cabling

Mobile All‑in‑One MDC on Wheeled Platforms

40-ft containerized data center with six racks (40 kW) on wheeled platforms, relocatable within one hour through pre-staged quick-disconnect systems.

Read the case study

Interior of deployable edge data center showing Liebert UPS systems and server racks with overhead power distribution and cable management

Deployable Edge Data Center for International Mission in Eastern Europe

ISO-width modular cluster delivering 40 kW across four racks for a temporary security mission, built to Tier III principles and redeployable at mission end.

Read the case study

Interior of indirect free cooling modular data center with UPS cabinets, server racks, gas fire suppression system, and overhead cable trays

Indirect Free Cooling MDC in Dense Urban Courtyard

Two shortened modules providing 35 kW IT load with indirect free-cooling, engineered to pass through a narrow archway and operate inside a historic courtyard.

Read the case study

FAQ

How many modular data centers have you deployed?

Over 35 modular data centers across Europe, serving telecom, energy, industrial, defense, and cloud sectors.

What industries do you work with?

Energy and oil & gas, mining, telecom and 5G, industrial automation, renewables, logistics and ports, defense and military, cloud and colocation, and research/HPC.

Can I visit a deployed ModulEdge site?

In most cases, yes. We can arrange site visits to reference deployments depending on the client's location and the end customer's security requirements. Contact us to discuss options.

Do you provide reference customers?

Yes. We can connect you with existing clients in your industry for reference conversations, subject to their availability and approval.

What's a typical project timeline from order to deployment?

3 to 6 months for custom builds. This includes design finalization, manufacturing, factory testing, shipping, and on-site commissioning. Simpler configurations on the shorter end, complex multi-module deployments on the longer end.